1. LAYOUT AT SITE
Spread drop cloths and layout canopy at exact position of desired
finished assembly. Any sharp objects which must remain on site under the
canopy should be padded and taped.
Assemble side poles and lay straight out from each pole hole in canopy.
Drive a stake 1' from the end of each pole. The stake must be driven through
the rig attached to each guy rope as shown.
|
 |
2. RAISE SIDE POLES
Start at opposite corners.
Insert side poles into pole holes and raise so that bottom of poles slant
toward center of canopy.
Adjust guy rope.
Continue with other two corners and the sides. |
|
|
3. RAISE CENTER POLE
Assemble three piece center pole and insert into center pole hole.
Raise to upright position and tie off jump rope to pole. |
 |
4. SIDE POLE ADJUSTMENT
Tighten guy ropes and then set side poles to upright position.
Adjust pole positions and guy rope tension to properly pull out canopy.
Protective covers are recommended for all stakes. |
 |